Wayne Rd. Dam Removal and River Restoration

The Wayne Road Dam, which was owned by Wayne County, was located in the City of Wayne on the Lower Branch of the Rouge River. The river hosts a variety of fish in the vicinity of the dam, including trout in upstream areas and a variety of warm water species. (e.g., smallmouth bass, northern pike, walleye, and sunfish) downstream of the dam. The dam removal provided fish passage which enhanced fish communities in the Lower Rouge River by reconnecting the Lower Rouge River to the Detroit River and Lake Erie ecosystem.

Prior to implementation of the project, the dam acted as a barrier to fish passage as well as promoted the accumulation of sediment and debris behind the dam, which contributed to the degradation of the reach of river. Removal of the Wayne Road Dam was a priority project for the Rouge River Advisory Council in order to implement the Delisting Targets for Fish and Wildlife Habitat and Population Beneficial Use Impairments for the Rouge River Area of Concern. The ARC proposed the project to aid in the advancement of the AOC delisting efforts.

The implementation of the project has improved the riparian corridor and hydrologically reconnected approximately 121 miles of river and tributaries to the Great Lakes system for the first time in over a century. The river hosts a variety of fish species in the vicinity of the former dam, including a variety of warm water species (e.g., smallmouth bass, northern pike, walleye, suckers, darters, minnow, and sunfishes). All of these species have benefitted as a result of the implementation of this project. Rock structures and bank stabilization improved fish and wildlife habitat, benefiting key aquatic species and natural communities.

Under a Wayne County Rouge Program Office grant, the Design was completed. Construction and monitoring of the project was completed under Great Lakes Restoration Inititive Funding (GLRI) throuugh through a National Oceanic and Atmospheric Administration (NOAA) grant. The NOAA-funded project removed the dam and restored fish passage. In addition to the removal of the dam the project removed an in-stream island downstream of the dam and reconstructed a more stable single flow channel with bankfull benches, installed an engineered riffle/ boulder cascade to protect existing infrastructure and facilitate fish passage, and provided for bank stabilization.

Amentities have been added to enhance the public's access to the area including trails and a canoe/kayak launch site.

Funding and Parnters

Design and permitting was completed under a Rouge Project Office (RPO) grant. Construction and monitoring was completed under a National Oceanic and Atmospheric Administration (NOAA) grant (#NA11NMF4630146 to the Alliance of Rouge Communities. Partners in this project include the U.S. EPA, GLRI, NOAA, ARC, City of Wayne, Wayne County, Friends of the Rouge and the Rouge River Advisory Council (RRAC)

Where and When

Wayne Rd. Dam is located in Wayne, Michigan and is a tributary of the Lower Branch of the Rouge River. Project design began in 2010 and was completed in 2013.

Project Outcomes

Improved the riparian corridor and hydrologically reconnected approximately 121 miles of river and tributaries to the Great Lakes system for the first time in over a century. Increased aquatic diversity throughout the Rouge River for fish species, macroinvertebrates, and other aquatic life.

Photo History of Project:


Conditions Before Restoration








 

Photo Gallery of Restoration Activities


Removal of log jams





Lowering of water level at the dam by notching the dam





Removal of the dam sill





Rock for the riffle was placed under the bridge. A 6" thick layer of smaller stone was placed first and overtopped by larger rock.





Sand bankfill was placed behind the stone toe. Geotextile fabric was used between the stone toe and the sand backfill.





Storm pipe was installed at existing outfall to extend the pipe through the proposed bankfull bench to the stream channel.





A portion of the existing island was excavated. It was eventually completely removed.





Bankfull bench construction view looking upstream towards bridge.





After restoration





After restoration